REAMERS
Reamers are crucial drilling tools used in non-excavation engineering such as HDD (Horizontal Directional Drilling) and oil and gas drilling. Their main function is to expand the wellbore diameter from the initial small diameter of the pilot hole to the size required for the installation of pipes, cables or casings.
Unlike the machine processing reaming tools, the engineering expansion bit is designed for rock and soil formations, aiming to expand the hole, remove debris, and maintain the diameter.
It belongs to the non-excavation drilling tool series and is the core equipment for pipeline crossing obstacles such as rivers, roads, and buildings.

1. Working principle:The core working logic of reamers is: power transmission, cutting and crushing, mud carrying, and diameter retention and shaping.
1) Power transmission: The drilling rig transmits torque and thrust (or pullback force) through the drill pipe to the reaming tool, causing it to rotate at high speed.
2) Cutting and crushing: The hard alloy/PDC cutting teeth on the surface of the reamer come into contact with the hole wall, breaking the rock and soil through scraping and grinding, gradually expanding the hole diameter.
3) Mud-carrying and slag removal: High-pressure drilling fluid (mud) is injected through the drill pipe and flows through the flow channel of the reaming tool. The cuttings produced during the cutting process are carried to the ground, while the cutting teeth are cooled and the hole wall is stabilized.
4) Diameter retention and shaping: Structures such as barrel type and laminated type are equipped with retention strips/retention surfaces, ensuring that the hole diameter is uniform and the hole path is straight after reaming, providing a guarantee for the subsequent pipe pulling back.

2. Work method
1) Pilot hole stage: Use a guiding drill bit to drill a small-diameter pilot hole, precisely controlling the trajectory.
2) Pull-back reaming: Connect the reamer to the rear end of the drill pipe, pull back from the receiving pit to the launching pit, rotating while reaming.
3) Progressive reaming: If the target hole diameter is large, use different-sized reamer to ream step by step (such as expanding to 200mm first, then to 500mm).
4) Pipeline pull-back: After the hole diameter meets the standard, connect the pipeline to be laid at the tail of the reamer, and pull back along the drill pipe to complete the underground laying.

3. Purpose
1) Non-digging pipeline laying: Gas, water supply and drainage, power, communication and other pipelines pass through rivers, roads and buildings, avoiding ground damage caused by excavation.
2) Oil and gas drilling projects: Increase the diameter of the wellbore to meet the requirements for casing insertion and oil extraction operations.
3) Geological exploration: Expand the diameter of the exploration holes to obtain more complete rock cores or install monitoring equipment.
4) Mining engineering: Repair and expand the diameters of underground tunnels and ventilation holes.
4. Future development trends: The future horizontal directional drilling reamers will develop towards intelligence, high efficiency and wear resistance, as well as modularization. Built-in sensors enable real-time monitoring of working conditions, suitable for complex strata; using ultra-hard wear-resistant materials and replaceable cutting teeth can extend service life and reduce costs; the modular structure facilitates quick replacement, and at the same time, it upgrades to larger diameters, less disturbance, and environmental protection, improving the efficiency and safety of long-distance crossing construction.